oaks christian

Our project at Oaks Christian School consited of a 30, 000 square foot state-of-the-art Media Production Studio and Performing Arts Center.

ETI was asked to complete the project in five distinct phases. The company handled all the cabling and patches panels in the first phase; outfitted the multipurpose and control rooms and the media studio during the second and third phases. Included in the Media Production Studio is real time recording from the Performing Arts Center and the ability to manipulate that in post production. Included in the Performing Arts Center is video support with live HD cameras, digital audio routing system including a digital mixing consul. The system was designed with
maximum flexibility as the center houses the school’s Basketball and Volleyball teams.

Set-up the classrooms during the fourth stage and installed the high-def cameras in the fifth stage. Classrooms included a black box/ green room that is the production studio for the campus wide TV channel news
show. Additional classroom included choir, dance, band rehearsal rooms, and a keyboard room.

For additional information, please see the article by David John Fairinella, “Production and Sports Get Equal Billing at Oaks Christian.”